Things are moving quickly at the Civic Centre Library. Here is a quick update on what is happening as of this week.
- Exterior insulation installation is complete at the south side of the building.
- Framing and welding at the main entrance is ongoing.
- Glazing installation continues around the exterior perimeter at the east elevation.
- Composite panel installation is progressing at the north side and around the Reading Garden.
- Sidewalks are 50% poured at the north side and curb work is progressing at the east and north sides.
- Interior steel stud work has progressed in all areas.
- Drywall installation continues throughout the first and second floors.