Civic Centre Resource Library – March 30

Bookmark and Share

Lots is happening at the Civic Centre Resource Library this week. Lighting installation is almost complete. Tiling and paint touch-ups are ongoing throughout the facility. Washroom fixture installation is ongoing as well. Ceiling work is nearing completion with the installation of ceiling tiles. The sliding doors have been installed at the main entrance and miscellaneous work is ongoing.

Front entrance work is ongoing. Sliding doors have been installed.

Adult collection

View of the adult collection area.

teen zone

View of the glass doors to the Teen Zone.

study hall

View of the Study Hall.

door to the 2nd floor balcony

Doors to the 2nd floor balcony.

 

 

Civic Centre Resource Library – March 23

Bookmark and Share

This week, giant banners have been installed at the Civic Centre Resource Library, near Major MacKenzie Drive and Keele Street to let pedestrians and drivers passing by know that the new library is opening soon! Check out these great looking banners.

sign 1Sign 2

 

Civic Centre Resource Library – March 10

Bookmark and Share

Many things are happening at the Civic Centre Resource Library this week.  The front entrance sliding doors have been installed. Vestibule formation is almost complete. Installation of interior glazing and lighting continues. Wood panel installation at the adult area is almost complete, and bench seating is being installed around the building.

1

Front entrance sliding doors have been installed.

2

View of the corridor to the cafe and teen area.

3

View of the teen area.

Interior glazing installation is ongoing.

5

Life safety systems are being installed.

6

View of the adult collection area.

 

Civic Centre Resource Library – March 3

Bookmark and Share

The weather is slowing warming up, construction at the Civic Centre Resource Library is coming along very well. Painting work is ongoing at the main floor. Ceiling work is nearing completion. Ceiling baffles and lighting installation are ongoing in the teen and adult areas. Bench seating is being installed. Tile work is ongoing at the washrooms.

1

Painting work is ongoing at the main floor.

2

Above ceiling work is nearing completion.

3

Ceiling baffles and lighting installation are ongoing in the teen and adult areas.

4

Tile work is ongoing at the washrooms.

5

Bench seating installation in ongoing.

6

Wood paneling work is ongoing above the children's area.

7

Interior light fixtures have arrived on site and installation is ongoing.