The parameter wall structure, drywall steel installation are progressing at Pleasant Ridge Library. The roof curb material arrived for installation and drywall steel studs are being installed.
![june13-1 June 17](http://www.vaughanpl.info/building/wp-content/uploads/june13-12.bmp)
Parameter wall structure in progress
![june13-4 June 17](http://www.vaughanpl.info/building/wp-content/uploads/june13-4.bmp)
Parameter wall base track at the reading garden entrance being built
![june13-5 June 17](http://www.vaughanpl.info/building/wp-content/uploads/june13-5.bmp)
Curb and parapet material on site
![june13-6 June 17](http://www.vaughanpl.info/building/wp-content/uploads/june13-6.jpg)
Drywall steel studs installation in progress
![june13-2 June 17](http://www.vaughanpl.info/building/wp-content/uploads/june13-21.jpg)
Drywall installation in progress