This week at Pleasant Ridge Library, the spray foam insulation have been applied to the walls, the electrical distribution panel has been installed. Workers installed the glass windows on the south and north side of the building. The framing of the exterior soffit continues.
![photo1 spray foam](http://www.vaughanpl.info/building/wp-content/uploads/photo17.jpg)
Spray foam insulation applied to the interior face of the exterior walls.
![photo2 Electric distribution](http://www.vaughanpl.info/building/wp-content/uploads/photo23.jpg)
The electrical distribution panel has been installed.
![photo3 soffit](http://www.vaughanpl.info/building/wp-content/uploads/photo31.jpg)
The framing of the exterior soffit continues.
![photo4 Glass](http://www.vaughanpl.info/building/wp-content/uploads/photo41.jpg)
The glass windows on the south wall adjacent to the existing building have been installed.
![photo5 glass wall](http://www.vaughanpl.info/building/wp-content/uploads/photo5.bmp)
The glass windows on the north wall at the Reading Garden entrance have been installed.