In April 2010, VPL renovated its Kleinburg Library branch. The renovations included the installation of a new lift, which provides access to all three floors, the addition of an accessible washroom on the lower level and the installation of a new visual fire alarm to ensure compliance with the Accessibility for Ontarians with Disabilities Act. The main entrance and foyer was also revitalized, a new Check Out Desk was added, a new internal/external book drop was installed, two washrooms were refurbished and more!
On June 22, Kleinburg Library celebrated its grand re-opening by inviting customers to drop by to check out its completed renovations. The official welcome included a great story about Clifford topped with a visit from the big red dog himself!
![new-check-out-desk](https://www.vaughanpl.info/building/wp-content/gallery/gallery_3/new-check-out-desk.jpg)
![new-information-desk](https://www.vaughanpl.info/building/wp-content/gallery/gallery_3/new-information-desk.jpg)
![new-lift-exterior-view](https://www.vaughanpl.info/building/wp-content/gallery/gallery_3/new-lift-exterior-view.jpg)
![new-lift-interior-view](https://www.vaughanpl.info/building/wp-content/gallery/gallery_3/new-lift-interior-view.jpg)
![new-sliding-doors](https://www.vaughanpl.info/building/wp-content/gallery/gallery_3/new-sliding-doors.jpg)
![kl-grand-reopening](https://www.vaughanpl.info/building/wp-content/gallery/gallery_3/kl-grand-reopening.jpg)