Vellore Village Library – More Renderings

Bookmark and Share

We hope everyone enjoyed the renderings of the new Vellore Village Library last week. Here are a few more for your viewing pleasure. Stay tuned for more updates.

Skate Park

Skate park outside of the library.

library view without a roof

View of the library without the roof.

Entry way to the library.

Entry way to the library.

Lounge Area

view of the lounge area.

View of the work stations.

View of the work stations.

 

 

 

Vellore Village Library – Floor Plan & Rendering

Bookmark and Share

Exciting news for Vaughan citizens living in the Vellore Village community. Renderings of the beautiful new library coming to your neighbourhood are now available for your viewing pleasure. Check them out!

floor plan

Proposed floor plan of the library.

library

Proposed library addition attached to the existing Vellore Village Community Centre.

view

Drop-off area.

4

View of the skate park.

inside

View of the interior of the library.

 

Civic Centre Resource Library – March 30

Bookmark and Share

Lots is happening at the Civic Centre Resource Library this week. Lighting installation is almost complete. Tiling and paint touch-ups are ongoing throughout the facility. Washroom fixture installation is ongoing as well. Ceiling work is nearing completion with the installation of ceiling tiles. The sliding doors have been installed at the main entrance and miscellaneous work is ongoing.

Front entrance work is ongoing. Sliding doors have been installed.

Adult collection

View of the adult collection area.

teen zone

View of the glass doors to the Teen Zone.

study hall

View of the Study Hall.

door to the 2nd floor balcony

Doors to the 2nd floor balcony.

 

 

Civic Centre Resource Library – March 23

Bookmark and Share

This week, giant banners have been installed at the Civic Centre Resource Library, near Major MacKenzie Drive and Keele Street to let pedestrians and drivers passing by know that the new library is opening soon! Check out these great looking banners.

sign 1Sign 2

 

Civic Centre Resource Library – March 10

Bookmark and Share

Many things are happening at the Civic Centre Resource Library this week.  The front entrance sliding doors have been installed. Vestibule formation is almost complete. Installation of interior glazing and lighting continues. Wood panel installation at the adult area is almost complete, and bench seating is being installed around the building.

1

Front entrance sliding doors have been installed.

2

View of the corridor to the cafe and teen area.

3

View of the teen area.

Interior glazing installation is ongoing.

5

Life safety systems are being installed.

6

View of the adult collection area.

 

Civic Centre Resource Library – March 3

Bookmark and Share

The weather is slowing warming up, construction at the Civic Centre Resource Library is coming along very well. Painting work is ongoing at the main floor. Ceiling work is nearing completion. Ceiling baffles and lighting installation are ongoing in the teen and adult areas. Bench seating is being installed. Tile work is ongoing at the washrooms.

1

Painting work is ongoing at the main floor.

2

Above ceiling work is nearing completion.

3

Ceiling baffles and lighting installation are ongoing in the teen and adult areas.

4

Tile work is ongoing at the washrooms.

5

Bench seating installation in ongoing.

6

Wood paneling work is ongoing above the children's area.

7

Interior light fixtures have arrived on site and installation is ongoing.

 

 

Civic Centre Resource Library – Feb. 12

Bookmark and Share

This week at the Civic Centre Resource Library, framing and drywall installation are progressing throughout the building. Painters continue to complete spraying the ceiling and are working on the first coat of the walls at the teen area and office areas on the ground floor. Light fixture installation has started at the adult collection area. Tile work has commenced at the washrooms.

1

View of collaboration rooms at the west. Mechanical work is almost complete in the ceiling space.

ceiling

Painting work has progressed at the ceiling and bulkheads.

Light fixture

Light fixture installation has commenced at the adult collection area.

Floor grille

View of the adult collection area. Floor grille installations at the perimeter are ongoing.

washroom

Prep work is almost complete for tile installation in the washrooms.

 

 

Civic Centre Resource Library – Feb. 2

Bookmark and Share

This week at the Civic Centre Resource Library, workers are continuing to install miscellaneous framing around the glazing on the east and south face. Framing work is still ongoing at the main entrance at the south side, and the framing of the vestibule is progressing with drywall installation at the ceiling.Painters are on site and are spraying the ceiling at the children’s zone, moving west towards the proposed computer area. Installation of the elevator is ongoing now that the electrical work is complete.

1

View of east elevation at the main lobby. Framing is ongoing at stairwell A.

2

Ceiling spray painting has commenced over the children's area.

3

Drywall mudding has been completed at the multi-purpose training room and the teen zone.

4

The elevator is in place and final connections are ongoing.

Drop Ceiling

Drop ceiling (T-bar) installation has commenced at the 2nd floor northeast corner.

Civic Centre Resource Library – Jan. 20

Bookmark and Share

The cold weather has not not stopped the Civic Centre Resource Library from moving forward. As of this week, workers continue to install composite panels on the east and south sides. Framing work is ongoing at the main entrance. Interior steel stud work has progressed in all areas and is ongoing at the second level mezzanine. Installation of the elevator is ongoing now that the electrical work is complete. Painters are on site to commence work.

View of the southeast elevation.

2

View of the main entrance.

3

Framing and drywall is almost complete at the multi-purpose training room.

5

View of the program room.

6

Primer painting to commence at the adult collection area.

 

Civic Centre Resource Library – Dec. 23

Bookmark and Share

Things are moving along quickly at the Civic Centre Resource Library this week. Workers continue to install composite panels on the east side. Framing work is still ongoing at the main entrance at the south. Glazing installation continues around the exterior perimeter (east and south elevations). Interior steel stud work has progressed in all areas and is ongoing at the second level mezzanine and stairwell areas. Drywall installation continues throughout the first floor along with mudding and taping. Temporary plywood has been installed to enclose the building until exterior glazing and panelling can be completed in January.

1

View of main entrance.

2

View of main lobby.

3

View of computer area.

View of interactive family area.

View of maker space & teen area.

View of maker space & teen area.